  • in reply to: Arc Flash #2011
    RBriggs_BWR
    Participant

      They have DC control power. As I understand it, they remove the fuses to ensure that the breaker doesn’t get and close signal during the racking activity.

      in reply to: Temporary Power #2008
      RBriggs_BWR
      Participant

        The downstream bus powers one of the Emergency Response facility HVAC systems along with some other non-safety building HVAC and lighting. My plant determined that the temp power was not a Temp Alt in Support of Maintenance and we went back and did a 50.59 Screening on the activity.

        in reply to: Electromechanical to Full Scale Digital Protective Relays #1992
        RBriggs_BWR
        Participant

          I have it on my list for 2022 to develop the modification to replace the non-safety main generator relays with a digital generator protection system. I agree there is fear in going to digital. I am not especially looking forward to going through the new digital mod requirements that were added to the industry standard design process.