Skip to content

the Nuclear Electrical Engineer

An educational resource for electrical engineers in the nuclear power industry

  • Home
  • Start Here
  • About This Site
  • Contact Me
  • Log-In

Account

Register|Lost your password?

Departments

  • Atomic Energy History
  • Book Reviews
  • Conduit sizing
  • Design Basis
  • EMI/RFI training videos
  • Environmental Qualification
  • I&C
  • Licensing Basis
  • Miscellaneous
  • Mod Package Design Tips
  • News
  • Nuclear Electrical Engineer
  • Short-circuits and faults
  • Sizing Breakers
  • Sizing cable
  • The NRC
  • Tip of the Week

Legal Notices

  • Privacy Policy
  • Terms of Use

TIP OF THE WEEK

Get a FREE report:

25 Mistakes Every Nuclear Electrical Engineer Should Avoid

As a bonus when you sign up for my FREE Tip of the Week. It contains weekly tips, including important industry news or even simple ways to save money. They go out on Saturdays.

[Tip of the Week Archives]
(Click to see what you've missed.)

Q&A FORUMS

  • General Discussion
  • Pictures & Memes
  • Technical Support

Recent Forum posts

  • Arc Flash
  • Temporary Power
  • How to invest in new nuclear
  • Industry Standard Design Process
  • Electromechanical to Full Scale Digital Protective Relays
  • Oscillating Failure of Rosemount 1151 Transmitter
  • China – More new construction

Readers’ Recent Favorites

  • An explanation of the origin of a generator’s subtransient reactance
  • 50.59 - Why 10% is the criterion for determining "more than a minimal" increase
  • The difference between single-line and schematic diagrams
  • Breaker sizing and short-circuits
  • Cadwelds: what they are, how they work
© 2025 Nuclear Electrical Engineer by John Livingston, 2014-2025. All Rights Reserved. Reproduction without permission prohibited.