Outages and Operations
From Tip of the Week, 23 March 2019 — written after getting home. Now that I’m back from the outage, it’s time to get…
The Nuclear Electrical Engineer
Here you can find design tips on technical skills like cable and breaker sizing, short-circuit evaluations and more, PLUS deep-dive analysis of nuclear-specific topics like design basis, Tech Specs, UFSARs, and safety-related SSCs — built from primary source documents.
From Tip of the Week, 23 March 2019 — written after getting home. Now that I’m back from the outage, it’s time to get…
From Tip of the Week, 22 February 2020, with a practical note from 24 October 2020. Here I am again, working the night shift…
Discussing the importance of effective leadership during a plant outage, emphasizing communication and coordination. Highlights the reciprocal relationship between leaders and subordinates, outlining six…
From Tip of the Week, 7 March 2020. Plants and utilities need a cost-effective, fast way to identify cables that need to be replaced.
From Tips of the Week, 7 and 14 April 2018, following a February outage. Some questions only ever come up with a panel open…
From Tips of the Week, 25 February and 8 April 2017. My first outage was at Plant Hatch in February 2017, and it was…
From Tips of the Week, 29 February 2020, 7 November 2020, 5 December 2020 and 17 April 2021 — written across three outages. Here…
From Tip of the Week, 16 February 2019 — week two of a six-week outage. Working the outage night shift has me thinking a…