10 CFR 50.59 – A history of the rule’s development
Prior to 1962, the 50.59 process for modifying a nuclear plant without requiring prior Commission approval did not exist. There was no UFSAR. There…
Licensing Basis
The Nuclear Electrical Engineer
Here you can find design tips on technical skills like cable and breaker sizing, short-circuit evaluations and more, PLUS deep-dive analysis of nuclear-specific topics like design basis, Tech Specs, UFSARs, and safety-related SSCs — built from primary source documents.
Prior to 1962, the 50.59 process for modifying a nuclear plant without requiring prior Commission approval did not exist. There was no UFSAR. There…
Often a design will require updating something in the UFSAR. It might be a drawing or some text. There’s a process for that .…